TWI Training Within Industry
What is TWI?
“Training Within Industry” (TWI) is an important program designed specifically to enhance the role of the supervisors and managers at all levels in your organization. There is little/no evidence anywhere of a company performing well without the benefit of good supervisors. There is, however, abundant evidence to the contrary: good supervisors continuously and consistently facilitate superior performance through the people they supervise.
Supervisor is defined as: anyone who manages people and directs their work. This definition includes managers, directors and leaders at all levels in a company, including office environments as well as production.
The style of supervision also matters. Supervisors who, through their people perform well, see their jobs as COACHes, not COPs. They develop their people’s skills, knowledge, attitudes and are good role models as well. They are not of the old “command and control” breed.
TWI identifies 3 primary roles of supervisors:
1. The supervisor as trainer/developer of his/her people.
2. The supervisor as improver (working with his/her people to improve job methods).
3. The supervisor as leader of his/her people.
The four individual training programs in TWI:
Job Instruction, Job Methods, Job Relations, and Job Safety, are focused on each of the above supervisory roles. Each supervisor learns (or re-learns) the skills involved in world-class Job Relations, Job Instruction, Job Methods Improvement, and Job Safety as he/she participates in the TWI workshops. These workshops are applications oriented with a heavy concentration on the actual case studies supervisors bring in and work on.
How TWI Works
The format for the TWI training has been the same since it’s original creation in 1942. Basically, each program is 10 hours of classroom learning, 5 consecutive days (Monday- Friday,) 2 hours per day. This leaves time for participants to conduct their regular jobs and take the training without disrupting their work schedules or requiring the use of overtime to fill in for them while they’re in training.
Each of the 4 TWI Programs, Job Relations (JR), Job Instruction (JI), Job Methods (JM), and Job Safety (JS) follows the same 4-step* teaching process:
Step 1. Preparation – make the learner think to aid comprehension of the new idea.
Step 2. Presentation – add the new idea to those already in the learner’s mind.
Step 3. Application – train the learner to apply what was presented and check results.
Step 4. Testing – test the ability of the learner to apply the new idea alone.
Understanding Takt Time – Guest Post
Many have a hard time understanding what takt time is when it comes to Lean Manufacturing. In order to understand takt time, let’s imagine that you are a young child, and you have a paper route that you do before you go to school. The papers get delivered an hour before you have to go for your classes. So it would appear that you have sixty minutes to deliver all of your news papers. However, if you think about it do your really have a full sixty minutes? Perhaps not.
We must remember you have to get your bike ready and load your papers on your bike. For this example let us consider you can roll your papers while you’re pedaling your bicycle. You would also need to park your bike and put away your bag when you finish your route. So that hour really turns into more like fifty minutes.
Besides the time available, what else do you need to know to calculate the takt time for a newspaper delivery? Something else to consider is how many papers you actually have to deliver? Let’s say you have twenty five houses on your route. You now have enough information for your takt time calculations.
50 minutes / 25 houses = 2 minutes per paper.
The amount of time you have to deliver each paper is your takt time and in this case it is two minutes.
How long does it take to deliver each paper? (This would be your cycle time.) If it takes you less than two minutes, on average, you are able to meet your demand. If it takes longer, you are not going to get to school on time.
When there is a process that is extremely stable, like on an assembly line, it is easy to pace to the takt time. The work advances at a set pace, so the product rolls off the end in very predictable increments. This isn’t the situation with a newspaper route.
Why? Well, because there is a lot of variation. There are many variables like, the weather, the distance between houses. Some people like the paper placed neatly on the porch. Others don’t mind having it placed somewhere in the vicinity of the door. Some driveways are long. Some houses are close to the street. Some of your customer’s dogs are not so friendly, and so on.
On a paper route, or in the manufacturing plant, takt time works best as an average pace. Some papers get delivered quickly; others will take longer. Some phone calls can get resolved in a flash; others take a bit more time. But the law of large numbers eventually takes over. In many processes, you will find that every cycle is different, but any group of ten cycles looks an awful lot like any other group of ten cycles.
In manufacturing practice, or on your paper route, this allows you to use milestones or many times an actual digital take timer to keep on pace. If your takt time is two minutes for a process with variable inputs, you might use an hourly takt timer. You know you have to get thirty cycles done every sixty minutes. And when a team starts falling off the pace, and can recognize it early on by looking at the takt timer, leaders can make plans to get things back on schedule.
Things get even more confusing when there are cyclical changes in demand. Imagine that your local newspaper decides to offer a Sunday only delivery option, and 25 more houses on your route elect to get this big, unwieldy edition. Two things happen, right? First, you now have fifty minutes to deliver to fifty houses, a drastically reduced takt time of one minute. Plus, the Sunday paper is bulky and is harder to bundle up; and you just can’t carry as many on your bike. Even worse, you can’t toss a Sunday edition because the rubber band would break and create a mess. Your cycle time goes up at the same time that your takt time drops.
One option is to group your demand into different periods, for example, a Sunday takt time and a weekday takt time. No problem. You just have to get creative on how you staff for the different periods. Fast food restaurants adjust their staff throughout the day, as they know the pace picks up during mealtimes, and slows down the rest of the day. Whether they call it takt time or not, they end up matching their capacity to the required pace. On your paper route, you might do the same thing by hiring a friend to help you meet your Sunday demand, or you could work a longer shift.
So, let us get back to your paper route. Let’s assume that you want to earn more money by adding more customers to your route. Can you handle the load? The answer lies in being able to understand how fast you need to be able to work to meet the new demand.
Let’s see what happens if you add five houses to your route. Again, pull out your trusty takt time calculation.
50 minutes / 30 houses = 1:40 per paper
You would have to be able to deliver the paper at each house 20 seconds faster than before.
So, takt time serves to give you a real target for improvement, not just an arbitrary, made-up percentage. If it currently takes you 1:52 (112 seconds) per paper, you’d need an 11% reduction in your cycle time to meet your planned customer demand. (Cycle time is how long a process actually takes to complete. You reduce it by applying generous portions of continuous improvement.) Goals with a specific purpose are always easier for front-line employees to get behind than annual improvement goals (i.e. improve productivity by 10% per year).
Are you starting to see how takt time can improve your production?
How to Make Lean Manufacturing Successful and “Stick”: Thoughts for Top Management
How to Make Lean Manufacturing Successful and “Stick”: Thoughts for Top Management